|
Nov 23, 2024
|
|
|
|
ACC 2400 - Cost Accounting Prerequisite(s): ACC 2140 with grade C or better. Day division students only. A study of cost accounting by the elements of cost: material, labor, and factory overhead. Job order cost accounting, process cost accounting and standard cost accounting variances for material, labor and factory overhead are developed in-depth. The use of cost information in inventory decisions is covered. Credit(s): 3 (3 plus 0)
Add to Portfolio (opens a new window)
|
|